Notice

PennDOT Installing Westbound Protected Bike Lane in Spring 2021

October 2020 – PennDOT anticipates that a modular curb system with flexible delineator posts will be installed in Spring 2021 on the westbound side of the Grays Ferry Avenue Bridge over the Schuylkill River. This project safety enhancement will make the boundary between the westbound bike lane and the adjacent vehicular traffic lane more visible to both drivers and bicyclists.

The below photo is an example of the modular curb system with flexible delineator posts that will be installed on the westbound side of the Grays Ferry Avenue Bridge over the Schuylkill River.